*Evaporative condensers have different models in different countries, please select the appropriate model.

EC9 

9th GENERATION

STAINLESS STEEL
EVAPORATIVE CONDENSERS

More cost effective
with  world class  quality

EC9_GB_Asset (1).png

EASIER TO REPLACE
WITH COMPATIBLE FOOTPRINT

EC9 series has been designed to match the most widely used
footprint to avoid space issues and foundation modification
costs including reduced working time at site.

EASIER
FIELD
ASSEMBLY

WITH ONE-DAY KNOCK-DOWN UNIT

EC9 Container_GB.png

LOWEST 
SHIPPING
COST

 

 

4X CHEAPER

ALL CONTAINERIZED MODEL
UP TO 3900 kW

NOT ANY STAINLESS STEEL
CAN BE A CONDENSER

 

STAINLESS STEEL WITH
QUALITY BASED ON ASME STANDARDS

PROVEN FIELD TEST
PERFORMANCE RELIABILITY

Performance ratings are based on
test procedure CTI ATC-106,
acceptance test code for mechanical
draft evaporative vapor condensers

TH_EC9 (12).png

STAY EFFICIENT
PREVENT BREAKDOWN
WITHIN 30 MINS

Spray nozzles and branches can be easily
removed, cleaned and reassembled from outside
within 30 minutes.*

Water-spray must be cleaned at least
once a month to prevent nozzle clogging that
can lead to decreased efficiency and coil leakage.

EC9_GB_Asset (3).png

EXTEND YOUR PRODUCE LIFETIME
WITH PROPER BLEED RATE

Substandard water can damage stainless steel despite
its anti-corrosion properties. Therefore, bleed-off
need to be set at proper rate and verified regulary.

EC9_GB_Asset (2).png

Additional_diecut2.png

COMPLIANCE STANDARD

  • ASME B&PV SEC VIII (Design registration)
  • AS/NZS 3666.1 (Microbial control) 
  • AS/NZS 1359.5 (Australia MEPS)
  • AS 1657 (Fixed platforms and ladders)
     

ADDITIONAL EQUIPMENT

  • STANDBY PUMP
  • STAINLESS STEEL ACCESS
  • HOT GAS HEADER
  • HOT GAS HEADER w/VALVE
  • AUXILIARY COOLING CIRCUIT

Stand by pump.png

DOWNLOAD

Brochure and specification 

icon-arraw.png EC9 Brochure

Operation and Maintenance 

icon-arraw.png EC9 Operation and Maintenance